Here are some photos of the progress on our house so far:
Framing walls before pouring cement:
After the walls are poured:
Laying the subfloor, and sheeting for the floor of the main level of the house:
(Noah was a good instructor and let Anna handle some of the tools.)
Setting rafters. We had a lot of good help for this big job!
Here is a shot of the back of our house. The very left opening in the wall is our bedroom window, then to the right of that is a patio door to the covered porch from the great room. The great room window is next, then the patio door from the dining room.
After all of the rafters were set, the next job was to lay sheeting on the roof. Here is a picture of Noah, Leah, Adam and Rog was up there too helping that day.
Shingling came next which began August 23 and then finished on August 31.

We've been very happy with the progress that has been made so far!
We've been very happy with the progress that has been made so far!
Stay tuned for more photos to come!